Isbell Interim Housing Project

 

The Board awarded a contract to 19six Architects in November 2020 to design interim housing (portable classrooms) at Isbell Middle School.  This interim housing will be used to house staff and students  during the modernization of the main building on campus.  The interim housing design consists of sixteen 24'x40' classrooms, one 24'x40' classroom space for a library, a portable restroom building, and a 36'x40' administration building.

Construction efforts began on November 3, 2025.  Underground utilities were installed at the building pad area in February 2026, and the entire building pad area was paved during the second week of March 2026.

The project's second phase was completed during summer break 2026.  This included the construction of a new parking lot at the southeast corner of the Isbell campus.  Additionally,  power, network conduits, and water were all connected from the main campus to the portable building pad area during this summer phase.

The project's third and final phase is tentatively scheduled for the spring of 2027.  Interim portables will be delivered and installed during this third phase in anticipation for usage at the start of the 2027/2028 school year.